Cochranites can soon look forward to smoother roads near the Jack Tennant Memorial Bridge.

The James Walker Trail between Griffin Road and Riversong Boulevard is now undergoing paving work. The Town of Cochrane has posted on social media that the work will include protruding maintenance holes and bumps before the paving is finished.

pavingMap of paving location (Photo credit - Town of Cochrane)

The road is prepared for the final top-lift to be paved after becoming operational in 2020. Drivers are being advised to slow down and pay attention to all construction workers onsite.